Scope of Works

  • 4km of DN180 Sewer Rising Main via horizontal directional drilling
  • Air and Scour Assembly Structures
  • 300m of deep gravity sewer – 5m to 7m deep within the water table
  • 4 x Deep Insitu Manholes
  • 1 x Major Pump Station utilizing caisson construction techniques
  • Installation of emergency storage system for sewer pump station
  • MHL Dosing Building and chemical dosing system
  • Bulk Earthworks for Pump Station preparation
  • Electrical and mechanical fitout of the pump station
  • Connection to existing live network

Project Details

NAME: Beachmere Sewer Rising Main, Gravity Main and Pump Station

CLIENT: Palmlake Works

PROJECT TIMEFRAME: January 2015 – October 2015

VALUE: $3.2M

POSITION: Principal Contractor

LOCATION: Beachmere, QLD