Scope of Works

  • 1.6km DN375 DICL/MPVC Trunk Water Main
  • 120m DN408 MSCL Trunk Sewer Rising Main
  • 230m x DN500 PE100 Horizontal Directional Drilling
  • 2 x Cast in-situ Valve Chambers
  • Sheet Piling and Dewatering
  • Test and Commission
  • Tie-in Connecting to Existing Network
  • Reinstatement

Project Details

NAME: Gold Coast Trunk Water Main

CLIENT: McConnell Dowell

PROJECT TIMEFRAME: July 2012 – February 2013

VALUE: $1.8M

POSITION: Sub-Contractor

LOCATION: Main Beach, QLD

Gold Coast Trunk Water Main