Scope of Works

  • Excavation, Form, Reo, Pour and Backfill of
    • 720 kL SBR Tank including BioSelecter Chambers and Internal Baffles
    • Inlet Works Structure
    • Chemical Dosing Structure
    • Chlorine Contact Tank Extension
    • Algae Control Slab
  • Underground Pipework Package
    • Water Services
    • Pressure and Gravity Sewer Lines
    • Stormwater Drains
    • Chemical Lines
    • Sludge Waste Lines
    • Aeration Lines
  • Mechanical Package
    • Aeration system for SBR tank
    • Decanter for SBR Tank
    • Chemical Dosing System
    • Inlet Works Screening System
    • Replacement of existing blowers
    • Davit Crane Installation
    • Stainless Steel Baffles and Penstocks
    • Stairs, Handrails and Landing

Project Details

NAME: Jimboomba WWTP Upgrade Works

CLIENT: Downer Group

PROJECT TIMEFRAME: February 2015 – September 2015

VALUE: $1.4M

POSITION: Sub-Contractor

LOCATION: Jimboomba, QLD