Scope of Works

  • Installation of approx 580m of OD180 PE via Horizontal Directional Drilling (HDD)
  • 100m of sewerage rising main by open trench methods
  • 215m of gravity sewer by open trench methods,
  • 4 x concrete access chambers
  • 2 x Shut down connections to the existing sewerage pump station
  • Installation of air valve assembly structure
  • Reinstatement of all infrastructure including roads, footpaths, kerbs and turfed area’s

Project Details

NAME: SPS112 Rising Main Augmentation

CLIENT: Downer Group (Tenix)

PROJECT TIMEFRAME: October 2014 – December 2014

VALUE: $500K

POSITION: Sub-Contractor

LOCATION: Eagleby, QLD